The Savings Protocol

Step 1

Data Analysis


In order to define the opportunity and the feasibility of energy efficiency it is necessary to make a detailed analysis of the annual consumption of the system to test. 


Step 2

Energy Audit


In order to guarantee the result, a preventive measurement campaign of the installations is carried out. 

The measurement lasts 5/7 days and analyses all electrical quantities, with sampling rate per second.

Step 3

Efficiency Proposal with guaranteed % of saving

Based on the data measured during the audit and the international IPMVP® protocol in application of VDE-AR-E-2055-1 Icopower identifies the achievable % of savings through its technology and guarantees it in the contract.

Step 4

Installation of system and testing  

Icopower takes care of the installation of its technologies directly and/or by working alongside the customer’s technicians, arranging the most appropriate methods of intervention.